Regional News

The 10-storey Marassi Park ... MEP works in progress.

The 10-storey Marassi Park ... MEP works in progress.

Marassi Park reaches 40pc completion

01 September 2022

Eagle Hills Diyar, the pioneer behind the iconic Marassi Al Bahrain, said Marassi Park, a residential development on the Grand Boulevard at Diyar Al Muharraq, has reached 40 per cent of construction, with completion set for end of Q3, 2023.

The 10-storey building is currently cast up to level 9. The blockwork, aluminium, and mechanical, electrical and plumbing (MEP) works are currently in progress, and a mock-up was due to be ready by end of last month (August). The total site area is 7,333 sq m while the gross floor area (GFA) is 25,500 sq m.

Designed by Gulf House Engineering (GHE) architecture firm, Marassi Park consists of one building with three connected blocks housing a total of 249 units. Residents of the project will have easy access to the Marassi beach front, as well as several nearby amenities including a gymnasium, adult’s and children’s swimming pools and a 2-km promenade, in addition to being in close proximity to the upcoming Marassi Galleria Mall.

Future residents can obtain financing from an array of mortgage options available at their preferred bank. 




More Stories



Tags