01 February 2000
Approximate areas:
Apron level: 34,500 sq m (excluding baggage handling areas)
Departure level: 50,000 sq m
Arrival level: 10,000 sq m
Hotel level 1: 3,500 sq m (excluding mechanical plant room)
Hotel level 2: 3,500 sq m (excluding mechanical plant room)
Maintenance level: 635 sq m (above hotel rooms)
Mechanical rooms: 5,215 sq m (at hotel level 1)
Tunnel: 7,120 sq m (passenger)
Fixed Bridges: 1,900 sq m
Glass Panels:
Curtain wall and gable end glass: 12,000 sq m
Lower wall panel cladding: 3,000 sq m
Roof panel cladding: 57,000 sq m
Fixed bridge panel cladding: 9,000 sq m
Fixed bridge glass: 1,000 sq m
Glass panels on the moving air bridges: 116 sq m /bridge average (47 bridges)
Glass walls and banisters: 11,000 sq m
Granite Flooring: 50,000 sq m
Carpet Flooring: 7,000 sq m
Windows: 15,000 sq m
Wall finishes: Painted metal
Escalators/travelators: 55 nos.