Dubai Airport Expansion

Key statistics at a glance ....

01 February 2000

Approximate areas:

Apron level: 34,500 sq m (excluding baggage handling areas)

Departure level: 50,000 sq m

Arrival level: 10,000 sq m

Hotel level 1: 3,500 sq m (excluding mechanical plant room)

Hotel level 2: 3,500 sq m (excluding mechanical plant room)

Maintenance level: 635 sq m (above hotel rooms)

Mechanical rooms: 5,215 sq m (at hotel level 1)

Tunnel: 7,120 sq m (passenger)

Fixed Bridges: 1,900 sq m

Glass Panels:

Curtain wall and gable end glass: 12,000 sq m

Lower wall panel cladding: 3,000 sq m

Roof panel cladding: 57,000 sq m

Fixed bridge panel cladding: 9,000 sq m

Fixed bridge glass: 1,000 sq m

Glass panels on the moving air bridges: 116 sq m /bridge average (47 bridges)

Glass walls and banisters: 11,000 sq m

Granite Flooring: 50,000 sq m

Carpet Flooring: 7,000 sq m

Windows: 15,000 sq m

Wall finishes: Painted metal

Escalators/travelators: 55 nos.




More Stories